Road Construction

Oromia - Sidama Regional Arterial Highway Link

Client: Ethiopian Roads Administration (ERA) Location: Adama - Modjo Link, Oromia Year: 2024 Status: Ongoing

Project Overview

A high-priority national logistics corridor designed for heavy freight transport. The roadway features 50mm asphalt concrete wearing course, stone mastic asphalt, extensive drainage channels, and solar-powered smart street lighting at intersections.

Dual-lane asphalt concrete highway expansion connecting key industrial distribution hubs and agricultural export centers.

Project Deliverables

Earthwork cut & fill exceeding 450,000 cubic meters
Crushed rock sub-base and cement-stabilized foundation base
High-compaction asphalt concrete paving with modern spreaders
Continuous concrete curb, side gutters, and drainage culverts
Thermo-plastic reflective road marking and steel guardrails

Project Gallery

1 Photo
Oromia - Sidama Regional Arterial Highway Link gallery 1
/
Oromia - Sidama Regional Arterial Highway Link preview